Research Article
Optimal Control Strategy of Platform Load Oriented to Network and Load Cooperation
Table 10
Load demand response attributes of each user.
| | Load number | Maximum /average load | Load start time | Load end time | Minimum running time | Minimum /average load | Minimum downturn time | Incentive scheduling cost (first stage) | Incentive scheduling cost (second stage) | Incentive scheduling cost (third stage) | Stand-by cost | Total limit calls number of stimulated DR | Maximum reserve capacity of incentive DR | PDR/IDR | Load type |
| | 1 | 1.15 | 1 | 24 | 4 | 0.75 | 4 | 5 | 10 | 15 | 3 | 8 | 200 | PDR&IDR | Translational | | 2 | 1.15 | 1 | 24 | 3 | 0.75 | 3 | 5 | 10 | 20 | 3 | 8 | 30 | PDR&IDR | Transferable | | 3 | 1.15 | 1 | 24 | 2 | 0.75 | 2 | 5 | 10 | 25 | 3 | 8 | 30 | PDR&IDR | Reducible | | 4 | 1.15 | 1 | 24 | 2 | 0.75 | 2 | 5 | 15 | 30 | 3 | 8 | 40 | PDR&IDR | Reducible | | 5 | 1.15 | 1 | 24 | 1 | 0.75 | 0 | 50 | 50 | 50 | 20 | 1 | 80 | PDR&IDR | Reducible | | 6 | 1.15 | 1 | 24 | 2 | 0.75 | 2 | 4 | 9 | 14 | 3 | 8 | 200 | PDR&IDR | Translational | | 7 | 1.15 | 1 | 24 | 3 | 0.75 | 3 | 4 | 9 | 19 | 2 | 8 | 30 | PDR&IDR | Transferable | | 8 | 1.15 | 1 | 24 | 2 | 0.75 | 2 | 4 | 9 | 24 | 2 | 8 | 30 | PDR&IDR | Reducible | | 9 | 1.15 | 1 | 24 | 2 | 0.75 | 2 | 4 | 14 | 29 | 2 | 8 | 40 | PDR&IDR | Reducible | | 10 | 1.15 | 1 | 24 | 1 | 0.75 | 0 | 50 | 50 | 50 | 20 | 1 | 80 | PDR&IDR | Reducible | | 11 | 1.15 | 1 | 24 | 0 | 0.75 | 0 | 1000 | 1000 | 1000 | 1000 | 16 | 0 | PDR | | | 12 | 1.15 | 1 | 24 | 0 | 0.75 | 0 | 1000 | 1000 | 1000 | 1000 | 8 | 0 | PDR | | | 13 | 1.15 | 1 | 24 | 0 | 0.75 | 0 | 1000 | 1000 | 1000 | 1000 | 8 | 0 | PDR | | | 14 | 1.15 | 1 | 24 | 0 | 0.75 | 0 | 1000 | 1000 | 1000 | 1000 | 8 | 0 | PDR | | | 15 | 1.15 | 1 | 24 | 0 | 0.75 | 0 | 1000 | 1000 | 1000 | 1000 | 1 | 0 | PDR | |
|
|