Research Article

Simulation-Based Multiobjective Optimization of Open-Pit Mine Haulage System: A Modified-NBI Method and Meta Modeling Approach

Table 11

Optimum and existing situation.

SituationVariablesObjectivesImprovement (%)
Objective 1 (tons) Objective 2 (hours)

Existing204153612152332679% increase60% decrease
Optimum1252045218002078