Simulation-Based Multiobjective Optimization of Open-Pit Mine Haulage System: A Modified-NBI Method and Meta Modeling Approach
Table 6
Estimated effects and coefficients for the total ores production.
| Term | Coefficient | S.E coefficient | P value | t value |
| Intercept | 0.47 | 0.035 | 0.0001 | 13.4285 | | 0.15 | 0.033 | 0.0005 | 4.5454 | | 0.058 | 0.033 | 0.1010 | 1.7575 | | 0.20 | 0.033 | 0.0001 | 6.0606 | | 0.053 | 0.019 | 0.0140 | 2.7894 | | 0.069 | 0.023 | 0.0105 | 3 | | 0.041 | 0.019 | 0.0535 | 2.1578 | | 0.055 | 0.019 | 0.0140 | 2.8947 | | −0.064 | 0.023 | 0.0160 | −2.7826 | | 0.14 | 0.040 | 0.0038 | 3.15 | | −0.18 | 0.040 | 0.0007 | −4.5 |
|
|