Research Article
A Novel Mining Approach for Data Analysis and Processing Using Unmanned Aerial Vehicles
Table 1
Simulation and system parameters.
| Simulation and System Parameters |
| Targeted mining area, | | | Frequency | | 28 GHz | Min UAV height | | 100 | (, ) | NLOS | (113.63, 1.16, 2.58) | Number of teams members | U | 20 | (, , ) | LOS | (84.64, 1.55, 0.12) | GCs location | | (1000, 1000) | PSO max # of iterations | | 100 | Mining mission period | | | PSO population size | | 50 | Users velocity | | | Height of GCs | hGCs | 6 | # Of sub-regions inside each | | 10 | Noise power | | −100 dBm |
|
|