Research Article

Development of a Financing Optimization Framework Based on Risk Simulation in BOT Projects: A Case Study of the Waste-to-Energy Project

Table 10

Project objectives ranking.

RankAverageScopeQualityCostTimeObjectives

10.530.450.480.620.56Time
20.230.180.360.210.19Cost
30.150.270.120.070.14Quality
40.090.090.040.100.11Scope
 1.0011.008.334.831.78Total