Research Article
Development of a Financing Optimization Framework Based on Risk Simulation in BOT Projects: A Case Study of the Waste-to-Energy Project
Table 2
Risk probability ranking.
| Rank | Probability range | Description |
| 1 | 0%–10% | Rarely | 2 | 10%–20% | Very little | 3 | 20%–30% | Low | 4 | 30%–40% | Almost little | 5 | 40%–60% | Medium | 6 | 60%–70% | Almost much | 7 | 70%–80% | Much | 8 | 80%–90% | Very much | 9 | 90%–100% | Very likely |
|
|