Research Article

Development of a Financing Optimization Framework Based on Risk Simulation in BOT Projects: A Case Study of the Waste-to-Energy Project

Table 5

The title of the duration items.

Normal distribution of time

OptimisticMost likelyPessimisticSimulation value