Research Article

Development of a Financing Optimization Framework Based on Risk Simulation in BOT Projects: A Case Study of the Waste-to-Energy Project

Table 6

The title of the risk probability items and their time effect.

Risk 1Risk number
Risk uniform distribution
Probability of risk

Impact of riskOptimistic
Most likely
Pessimistic
Simulated value
Conditional