Research Article
Research on Path Optimization of Vehicle-Drone Joint Distribution considering Customer Priority
Table 10
Comparison of costs for different loads.
| Load (GD) | 20 | 25 | 30 | 35 | 40 |
| Number of vehicles | 7 | 6 | 5 | 5 | 4 | Number of drones | 4 | 4 | 5 | 5 | 4 | Drone flight cost | 310.9 | 316.7 | 321.4 | 339.7 | 377.0 | Total cost of drone distribution | 350.9 | 356.7 | 371.4 | 389.7 | 437.0 | Vehicle driving cost | 7051.7 | 6424.5 | 5539.9 | 5133.6 | 4968.1 | Total costs of vehicle distribution | 7751.7 | 7024.5 | 6039.9 | 5633.6 | 5368.1 | Priority cost | 3110.9 | 2476.7 | 1169.7 | 615.4 | 0 | Total cost | 11213.5 | 9587.9 | 7581.0 | 6638.7 | 5805.1 |
|
|