Case Report

Reconstruction of Natural Smile and Splinting with Natural Tooth Pontic Fiber-Reinforced Composite Bridge

Table 2

Procedures checklist and their chronological order.

1First sessionExamination, and supra- and sub-gingival scaling.
2After 4 weeksMeasuring periodontal indices.
Extraction of the maxillary right and lateral incisors.
3After 3 weeksThe healing of the extraction socket was re-evaluated and restorative procedure was initiated by impression-taking the study model was made.
Roots were sectioned and the proximal contours of the pontic were stripped to achieve the appropriate intra-arch position and correct the crowding.
Root canal space was debrided, cleaned, and filled with a self-adhering flowable composite.
The tissue side of the pontics was formed in a sanitary ovate shape.
Proximal contacts and soft tissue contact of the pontics were assessed intraorally and the final adjustment was done.
Pontics were finished and polished.
On the middle third of the palatal surfaces of pontics a preparation was performed
Acid etchant and adhesive were applied.
The pontics were fixed in place.
Pre-impregnated resin fiber strip was applied and covered by a resin composite.
Occlusion adjustment, finishing, and polishing.
4After 6 monthsFollow-up: Evaluated in the point of esthetic, occlusion, soft tissue contact of the pontics, and periodontal status of abutments and restored part of retainers and pontics. X-ray radiography was taken.
5After 12 monthsFollow-up: Evaluated in the point of esthetic, occlusion, soft tissue contact of the pontics, and periodontal status of abutments and restored part of retainers and pontics. X-ray radiography was taken.