Lane-Based Optimization for Macroscopic Network Configuration Designs
Table 2
Optimization results for intersection .
From arm,
Lane,
To arm, Assigned lane flow (pcu/h)
Total lane flow (pcu/h)
Turning proportion
Saturation flow (pcu/h)
Flow factor,
Start of green (s)
Effective green (s)
Degree of saturation
1
2
3
1
1
—
446.5185
0.0000
446.5185
1.0000
1746.67
0.2556
0.00
120.00
0.2556
2
—
0.0000
553.4815
553.4815
0.0000
2105.00
0.2629
0.00
78.80
0.4004
Total
—
446.5185
553.4815
1000.0000
2
1
144.0704
—
94.8377
238.9081
1.0000
1746.67
0.1368
83.80
31.20
0.5261
2
255.9296
—
0.0000
255.9296
1.0000
1871.11
0.1368
83.80
31.20
0.5261
Total
400.0000
—
94.8377
494.8377
3
1
96.5602
0.0000
—
96.5602
0.0000
1965.00
0.0491
0.00
78.80
0.0748
2
103.4398
0.0000
—
103.4398
0.0000
2105.00
0.0491
0.00
78.80
0.0748
Total
200.0000
0.0000
—
200.0000
Remarks. Lane marking is prohibited when assigned lane flow = 0.000 pcu/h; 1000.0000 pcu/h is the total demand flow from origin ; 400.0000 and 200.0000 pcu/h are the total 600.0000 pcu/h exit flows entering destination .