Research Article

Lane-Based Optimization for Macroscopic Network Configuration Designs

Table 5

Optimization results for intersection .

From arm,
Lane,
To arm,   
Assigned lane flow (pcu/h)
Total lane flow (pcu/h)Turning proportionSaturation flow (pcu/h)Flow factor, Start of green (s)Effective green (s)Degree of saturation
123

1153.4815256.0701309.55160.17281923.460.160978.2936.710.5261
20.0000338.7677338.76770.00002105.000.160978.2936.710.5261
Total53.4815594.8377648.3193

210.0000340.4530340.45301.00001746.670.19490.0073.290.3191
20.0000364.7092364.70921.00001871.110.19490.0073.290.3191
Total0.0000705.1623705.1623

31200.00000.0000200.00000.00001965.000.10180.00120.000.1018
20.0000300.0000300.00001.00001871.110.16030.0073.290.2625
Total200.0000300.0000500.0000

Remarks. Lane marking is prohibited when assigned lane flow = 0.000 pcu/h; 500.0000 pcu/h is the total demand flow from origin ; 594.8377 and 705.1623 pcu/h are the total 1,300.0000 pcu/h exit flows entering destination .