Makespan and percentage deviation under the operation times 20 s and 40 s.

Problem setOperation time 20 sOperation time 40 s
IHS HS GA IHS HS GA
MakespanPDMakespanPDMakespanPDMakespanPDMakespanPDMakespanPD

1235.60.00%2401.87%293.624.62%220.80.00%2220.54%264.719.88%
2473.70.00%487.32.87%675.942.69%473.80.00%481.41.60%612.229.21%
3924.90.00%945.22.19%1266.136.89%913.40.00%937.12.59%1215.833.11%
4464.40.00%465.30.19%53916.06%437.40.00%451.63.25%482.110.22%
5765.60.00%7761.36%968.126.45%759.50.00%760.50.13%942.424.08%
6959.10.00%997.84.04%1283.833.85%966.50.00%973.10.68%1198.123.96%
7977.23.48%944.30.00%1077.314.08%937.41.32%925.20.00%1024.510.73%
81142.50.00%1155.31.12%1393.421.96%1083.70.00%1104.11.88%1351.924.75%
91298.70.00%1308.60.76%1386.56.76%1235.50.00%1272.12.96%1316.96.59%