Research Article

A Two-Stage Three-Machine Flow Shop Assembly Problem Mixed with a Controllable Number and Sum-of-Processing Times-Based Learning Effect by Simulated Annealing Algorithms

Table 13

Normality test of residual error of the GLM model with the large size number of jobs.

Normality test
Hypothesis testStatistics value

Shapiro–WilkW0.916964Pr < W<0.0001
Kolmogorov–SmirnovD0.120337Pr < D<0.0100
Cramer–von MisesW-Sq0.862822Pr < W-Sq<0.0050
Anderson–DarlingA-Sq5.519845PR < A-Sq<0.0050