Research Article

A Two-Stage Three-Machine Flow Shop Assembly Problem Mixed with a Controllable Number and Sum-of-Processing Times-Based Learning Effect by Simulated Annealing Algorithms

Table 4

Simulation result for values.

ParameterJS_maxJS_minJS_meanJS_maxpiJS_minpiJS_meanpiSA_maxSA_minSA_mean
NMeanMeanMeanMeanMeanMeanMeanMeanMean

80.22.926.691.961.814.431.150.100.090.08
0.42.877.772.501.785.511.610.070.090.05
0.62.257.212.011.435.071.290.070.080.06

100.21.955.941.671.214.181.120.050.060.05
0.42.096.701.601.334.951.010.060.060.06
0.61.596.111.381.094.400.930.070.100.08

120.21.705.991.361.044.750.880.110.080.10
0.41.595.931.400.974.590.930.050.090.08
0.61.326.241.260.924.880.950.100.090.10

Mean2.036.511.681.284.751.100.080.080.07