Research Article

A Two-Stage Three-Machine Flow Shop Assembly Problem Mixed with a Controllable Number and Sum-of-Processing Times-Based Learning Effect by Simulated Annealing Algorithms

Table 7

Normality test of residual error of the GLM model in the small size number of jobs.

Normality test
TestStatistics value

Shapiro–WilkW0.936652Pr < W<0.0001
Kolmogorov–SmirnovD0.086882Pr < D<0.0100
Cramer–von MisesW-Sq0.532874Pr < W-Sq<0.0050
Anderson–DarlingA-Sq3.734124PR < A-Sq<0.0050