Research Article

A Two-Stage Three-Machine Flow Shop Assembly Problem Mixed with a Controllable Number and Sum-of-Processing Times-Based Learning Effect by Simulated Annealing Algorithms

Table 8

Kruskal–Wallis verification of the small size number of jobs.

Kruskal–Wallis test
Chi-squareDFPr > ChiSq

214.55118<0.0001