Research Article
Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
Table 2
The maximal values of
and the upper bound of
if
.
| | Variables | Values |
| | 9a + 1 | 9a + 2 | 9a + 3 | 9a + 4 | 9a + 5 | | The maximal value of | 11a + 1 | 11a + 3 | 11a + 4 | 11a + 5 | 11a + 6 | | Upper bound of | 11/9 | 14/11 | 5/4 | 16/13 | 11/9 | | 9a + 6 | 9a + 7 | 9a+8 | 9a + 9 | | | The maximal value of | 11a + 8 | 11a + 9 | 11a+10 | 11a + 11 | | | Upper bound of | 19/15 | 5/4 | 21/17 | 11/9 | |
|
|