Research Article

Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint

Table 2

The maximal values of and the upper bound of if .

VariablesValues

9a + 19a + 29a + 39a + 49a + 5
The maximal value of 11a + 111a + 311a + 411a + 511a + 6
Upper bound of 11/914/115/416/1311/9
9a +69a +79a+89a +9
The maximal value of 11a +811a +911a+1011a +11
Upper bound of 19/155/421/1711/9