Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
Table 4
The results of the algorithm H and branch-and-bound (B&B) algorithm for (
).
| | n | U | x | | | | Average CPU times of the algorithm H | Average CPU times of B&B algorithm | Average value of |
| | 50 | 3 | 2 | 0.2 | 3 | 0.5 | 0.0603 | 15.0346 | 1.012 | | 2 | 0.0615 | 15.0191 | 1.013 | | 0.2 | 10 | 0.5 | 0.0618 | 15.0233 | 1.011 | | 2 | 0.0612 | 15.0212 | 1.011 | | 1.2 | 3 | 0.5 | 0.0609 | 15.0305 | 1.013 | | 2 | 0.0620 | 15.0145 | 1.012 | | 1.2 | 10 | 0.5 | 0.0605 | 15.0221 | 1.012 | | 2 | 0.0618 | 15.0314 | 1.013 |
| | 50 | 7 | 10 | 0.2 | 3 | 0.5 | 0.0607 | 15.0324 | 1.011 | | 2 | 0.0608 | 15.0219 | 1.012 | | 0.2 | 10 | 0.5 | 0.0621 | 15.0309 | 1.012 | | 2 | 0.0624 | 15.0242 | 1.013 | | 1.2 | 3 | 0.5 | 0.0619 | 15.0287 | 1.011 | | 2 | 0.0618 | 15.0237 | 1.012 | | 1.2 | 10 | 0.5 | 0.0620 | 15.0228 | 1.010 | | 2 | 0.0621 | 15.0158 | 1.011 |
|
|