Research Article
Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
Table 5
The results of the algorithm H and branch-and-bound (B&B) algorithm for (
).
| | n | U | x | | | | Average CPU times of the algorithm H | Average CPU times of B&B algorithm | Average value of |
| | 30 | 3 | 2 | 0.2 | 3 | 0.5 | 0.0512 | 3.5346 | 1.130 | | 2 | 0.0526 | 3.6121 | 1.126 | | 0.2 | 10 | 0.5 | 0.0518 | 3.5193 | 1.213 | | 2 | 0.0572 | 3.4023 | 1.204 | | 1.2 | 3 | 0.5 | 0.0501 | 3.5012 | 1.127 | | 2 | 0.0513 | 3.3986 | 1.123 | | 1.2 | 10 | 0.5 | 0.0542 | 3.4591 | 1.113 | | 2 | 0.0537 | 3.5029 | 1.138 |
| | 30 | 7 | 10 | 0.2 | 3 | 0.5 | 0.0527 | 3.3092 | 1.214 | | 2 | 0.0528 | 3.4290 | 1.209 | | 0.2 | 10 | 0.5 | 0.0518 | 3.4232 | 1.120 | | 2 | 0.0519 | 3.5014 | 1.118 | | 1.2 | 3 | 0.5 | 0.0529 | 3.4879 | 1.104 | | 2 | 0.0608 | 3.3871 | 1.106 | | 1.2 | 10 | 0.5 | 0.0538 | 3.4381 | 1.169 | | 2 | 0.0521 | 3.3080 | 1.184 |
|
|