Research Article
Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
Table 6
The results of the algorithm H and branch-and-bound (B&B) algorithm for (
).
| | n | U | x | | | | Average CPU times of the algorithm H | Average CPU times of B&B algorithm | Average value of |
| | 50 | 3 | 10 | 0.2 | 3 | 0.5 | 0.0601 | 15.0412 | 1.103 | | 2 | 0.0612 | 15.0381 | 1.104 | | 0.2 | 10 | 0.5 | 0.0623 | 15.0315 | 1.113 | | 2 | 0.0625 | 15.0406 | 1.118 | | 1.2 | 3 | 0.5 | 0.0614 | 15.0337 | 1.217 | | 2 | 0.0623 | 15.0341 | 1.212 | | 1.2 | 10 | 0.5 | 0.0625 | 15.0502 | 1.204 | | 2 | 0.0631 | 15.0513 | 1.210 |
| | 50 | 7 | 2 | 0.2 | 3 | 0.5 | 0.0605 | 15.0372 | 1.132 | | 2 | 0.0611 | 15.0381 | 1.179 | | 0.2 | 10 | 0.5 | 0.0608 | 15.0401 | 1.124 | | 2 | 0.0621 | 15.0427 | 1.119 | | 1.2 | 3 | 0.5 | 0.0620 | 15.0381 | 1.221 | | 2 | 0.0619 | 15.0348 | 1.220 | | 1.2 | 10 | 0.5 | 0.0618 | 15.0329 | 1.217 | | 2 | 0.0623 | 15.0414 | 1.215 |
|
|