Research Article
Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
Table 7
The results of the algorithm H and branch-and-bound (B&B) algorithm for (
).
| | n | U | x | | | | Average CPU times of the algorithm H | Average CPU times of B&B algorithm | Average value of |
| | 30 | 3 | 10 | 0.2 | 3 | 0.5 | 0.0525 | 3.5281 | 1.219 | | 2 | 0.0527 | 3.5356 | 1.193 | | 0.2 | 10 | 0.5 | 0.0541 | 3.5027 | 1.201 | | 2 | 0.0547 | 3.5301 | 1.208 | | 1.2 | 3 | 0.5 | 0.0535 | 3.5531 | 1.120 | | 2 | 0.0539 | 3.5890 | 1.119 | | 1.2 | 10 | 0.5 | 0.0541 | 3.6211 | 1.301 | | 2 | 0.0545 | 3.6236 | 1.271 |
| | 30 | 7 | 3 | 0.2 | 3 | 0.5 | 0.0529 | 3.7210 | 1.271 | | 2 | 0.0532 | 3.8104 | 1.229 | | 0.2 | 10 | 0.5 | 0.0537 | 3.7147 | 1.201 | | 2 | 0.0539 | 3.7818 | 1.203 | | 1.2 | 3 | 0.5 | 0.0531 | 3.8201 | 1.308 | | 2 | 0.0610 | 3.9032 | 1.320 | | 1.2 | 10 | 0.5 | 0.0549 | 3.7138 | 1.301 | | 2 | 0.0556 | 3.9102 | 1.284 |
|
|