Research Article

A Multistep Prediction of Hydropower Station Inflow Based on Bagging-LSTM Model

Table 2

Evaluation results for lead time of 12 h.

Methods

SVR0.0041460.0228370.1654140.7851910.794646
DBN0.7213100.8500400.0721230.4153010.420302
RFR0.7557400.8785300.0688690.3886270.393308
GBRT0.7706200.8778990.0653270.3756280.380152
LSTM0.6654450.8201810.0789560.1136840.115053
Ours0.7894790.8887340.0624980.0899790.091062