Research Article

A Multistep Prediction of Hydropower Station Inflow Based on Bagging-LSTM Model

Table 3

Evaluation results for lead time of 24 h.

Methods

SVR0.000000 080.0141570.1656221.5743461.593306
DBN0.5848260.7751520.0919461.0275811.039956
RFR0.6919220.8458040.0799190.8749780.885515
GBRT0.7236480.8502490.0712630.8229570.832868
LSTM0.5464100.7519270.0933180.1327510.134350
Ours0.717 500.8487690.0718120.1043720.105629