Research Article
Dynamic Data Scheduling of a Flexible Industrial Job Shop Based on Digital Twin Technology
Table 2
Comparison of resource allocation results of three algorithms scheduling.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note. in Table 2 represents the Pareto optimal solution, which refers to the optimal resource scheduling result in an ideal state, and represents the optimal solution obtained after 50 iterations of each method. |