Research Article

Dynamic Data Scheduling of a Flexible Industrial Job Shop Based on Digital Twin Technology

Table 2

Comparison of resource allocation results of three algorithms scheduling.

Production line12345

Number of workpieces2030202530
Number of machines2015202020
9201,1559351,0361,208
Paper method9181,1589401,0351,210
Reference [9] method9281,1659551,0641,231
Reference [10] method9011,2679801,1431,341

Note. in Table 2 represents the Pareto optimal solution, which refers to the optimal resource scheduling result in an ideal state, and represents the optimal solution obtained after 50 iterations of each method.