Research Article
A Multiobjective Mathematical Model for Truck Scheduling Problem in Multidoor Cross-Docking System
Table 10
Superior performance of each problem based on SAW method for NSGA-II.
| Problems | NSGA-II | CPU time (second) | Total cost | Makespan (second) | Pareto solution |
| 1 | 0.440915 | 741 | 36055 | 3 | 2 | 0.431867 | 26531 | 175532 | 6 | 3 | 0.497491 | 41031 | 324173 | 29 | 4 | 0.431391 | 48770 | 573148 | 21 | 5 | 0.946947 | 87931 | 1406232 | 13 | 6 | 0.463434 | 103839 | 1756427 | 29 | 7 | 0.463434 | 185443 | 3287332 | 29 | 8 | 0.498891 | 140617 | 2181641 | 19 | 9 | 0.979835 | 1433406 | 19106634 | 13 | 10 | 1.50751 | 6382844 | 59333435 | 29 | Average | 0.6661608 | 845115.3 | 8818060.9 | 19.1 |
|
|