Research Article

Coordinated Control Strategy of Short-Turning Bus and Full-Length Bus Based on Stable Headway

Table 2

The bus information has been departed at the initial time of the simulation of the full-length bus and the short-turning bus.

Full-length busShort-turning bus

HA (min)5HB (min)6
Initial position (km)[0.85, 1.62, 2.9, 3.9, 5.28, 5.95, 7.69,
8.33, 10.07, 10.95, 14.1, 24.12, 34.04]
Initial position (km)[0.9,2.7,5.5,7.3]
Initial headway (min)[5,3.2, 3.1,3, 4.4, 1.9, 4.9, 2,5.4, 2.5,8,
16.9, 13.6]
S0 (km)0
Operating speed (km/h)[50.7, 14.5, 24.5, 19.7, 18.8, 21, 21.5,
19.2, 19.5, 21.2, 23.5, 35.5, 43.7]
S1 (km)73