Research Article
Wind Power Installed Capacity Forecast Based on a Two-Parameter Variable-Weight Buffer Operator and Subsidy Strategy Research
Table 4
Computational results of each evaluation metric in case study.
| Error | GM (1,1) | AWBO-GM (1,1) | 2-VWBO-GM (1,1) |
| Training set | RMSE | 4.90 | 0.40 | 4.60 | MAE | 4.17 | 0.33 | 3.61 | MAPE (%) | 27.13 | 0.62 | 9.61 | Test set | RMSE | 93.44 | 8.54 | 4.39 | MAE | 83.15 | 9.79 | 3.16 | MAPE (%) | 70.26 | 7.23 | 2.58 |
|
|