Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
Table 11
Results of objective functions in the ten iterations.
| Iteration 1: Best fit = 275.83 | Iteration 2: Best fit = 271.27 | Iteration 3: Best fit = 266.83 | Iteration 4: Best fit = 261.79 | Iteration 5: Best fit = 259.83 | Iteration 6: Best fit = 259.83 | Iteration 7: Best fit = 259.83 | Iteration 8: Best fit = 254.83 | Iteration 9: Best fit = 254.83 | Iteration 10: Best fit = 254.83 |
|
|