Research Article

Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)

Table 11

Results of objective functions in the ten iterations.

Iteration 1: Best fit = 275.83
Iteration 2: Best fit = 271.27
Iteration 3: Best fit = 266.83
Iteration 4: Best fit = 261.79
Iteration 5: Best fit = 259.83
Iteration 6: Best fit = 259.83
Iteration 7: Best fit = 259.83
Iteration 8: Best fit = 254.83
Iteration 9: Best fit = 254.83
Iteration 10: Best fit = 254.83