Research Article
Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
Table 13
Sequence of job 2 operations.
| Job | Operation | Machine | Start time | Final time | Duration |
| 2 | 8 | 8 | 0 | 115.68 | 115.68 | 2 | 4 | 4 | 0 | 57.2 | 57.2 | 2 | 9 | 23 | 115.68 | 174.82 | 59.14 | 2 | 10 | 10 | 174.82 | 254.96 | 80.14 | 2 | 7 | 22 | 0 | 19.31 | 19.31 | 2 | 1 | 1 | 160.03 | 186.58 | 26.55 | 2 | 2 | 19 | 186.58 | 297.05 | 110.47 | 2 | 3 | 20 | 297.05 | 415.96 | 118.91 | 2 | 5 | 21 | 57.2 | 213.65 | 156.45 | 2 | 6 | 6 | 333.6 | 361.19 | 27.59 |
|
|