Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
Table 14
Sequence of job 3 operations.
| Job | Operation | Machine | Start time | Final time | Duration |
| 3 | 5 | 26 | 0 | 104.19 | 104.19 | 3 | 6 | 6 | 104.19 | 146.15 | 41.96 | 3 | 1 | 1 | 122.39 | 160.03 | 37.64 | 3 | 2 | 24 | 160.03 | 272.24 | 112.21 | 3 | 3 | 25 | 0 | 101.75 | 101.75 | 3 | 4 | 4 | 248.29 | 287.4 | 39.11 | 3 | 7 | 27 | 146.15 | 271.16 | 12.01 | 3 | 8 | 8 | 271.16 | 311.1 | 39.94 | 3 | 9 | 28 | 311.1 | 430.94 | 119.84 |
|
|