Research Article
Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
Table 16
Sequence of job 4 operations.
| Job | Operation | Machine | Start time | Final time | Duration |
| 5 | 5 | 38 | 0 | 38.71 | 38.71 | 5 | 6 | 6 | 38.71 | 100.47 | 61.76 | 5 | 1 | 1 | 91.27 | 122.39 | 31.12 | 5 | 2 | 36 | 0 | 52.74 | 52.74 | 5 | 3 | 37 | 52.74 | 118.38 | 65.64 | 5 | 4 | 4 | 183.8 | 213.79 | 29.99 | 5 | 7 | 39 | 100.47 | 196.33 | 95.86 | 5 | 8 | 8 | 196.33 | 224.84 | 28.51 | 5 | 9 | 40 | 224.84 | 299.96 | 75.12 |
|
|