Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
Table 17
Comparing the obtained results from branch and bound algorithm.
| Thenumberof problem | Machines | Operations | Response | ARE | Fireflytime(seconds) | CPLEXtime(second) |
| 1 | 36 | 2 | 203 | 194 | 0.04 | 2 | 48 | 11 | 230 | 250 | 0.08 | 3 | 10 | 3 | 436 | 450 | 0.03 | 4 | 22 | 13 | 434 | 442 | 0.01 | 5 | 4 | 14 | 1053 | 1100 | 0.04 | 6 | 6 | 4 | 1899 | 2100 | 0.09 | 7 | 28 | 5 | 4049 | 4100 | 0.01 |
|
|