Research Article

Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)

Table 2

8-inch ABS booster line.

Name of 8-inch ABS booster line stationTime (minute : seconds)

First station27 : 27
Second station22 : 28
Third station10 : 06
Fourth station11 : 05
Fifth station38 : 29
Sixth station34 : 17
Seventh station19 : 94
Eighth station25 : 66
Ninth station36 : 09
Tenth station36 : 04
Eleventh station23 : 75
Twelfth station18 : 63
Thirteenth station32 : 63
Fourteenth station29 : 01
Fifteenth station30 : 78
Sixteenth station42 : 23
Seventeenth station17 : 71