Research Article
Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)
| Name of 9-inch ABS booster line station | Time (minute : seconds) |
| First station | 20 : 55 | Second station | 14 : 17 | Third station | 21 : 91 | Fourth station | 41 : 20 | Fifth station | 78 : 48 | Sixth station | 18 : 19 | Seventh station | 3 : 31 | Eighth station | 39 : 68 | Ninth station | 14 : 14 | Tenth station | 12 : 14 |
|
|