Research Article

Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)

Table 4

10-inch ABS booster line.

Name of 10-inch ABS booster line stationTime (minute : seconds)

First station31 : 64
Second station26 : 31
Third station39 : 37
Fourth station35 : 11
Fifth station25 : 19
Sixth station20 : 96
Seventh station27 : 01
Eighth station35 : 94
Ninth station45 : 84