Research Article

Modeling and Solving the Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times by Firefly Algorithm (Case Study: Automotive Industry)

Table 6

LX booster line.

Name of LX booster line stationTime (minute : seconds)

First station25 : 12
Second station23 : 74
Third station18 : 64
Fourth station15 : 99
Fifth station26 : 71
Sixth station18 : 76
Seventh station17 : 86
Eighth station21 : 51
Ninth station30 : 12