Research Article
Path Design and Planning and Investment and Construction Mode of Multimodal Transport Network Based on Big Data Analysis
Table 4
Transport paths and time at node J.
| Transit node | F | G | J | J | J | J | J | H | D | K |
| Railway distance (km) | — | 322 | — | 225 | — | Railway time (h) | — | 4.7 | — | 2.8 | — | Highway distance (km) | 415 | 321 | 357 | 226 | 268 | Highway time (h) | 5.3 | 4.5 | 4.6 | 2.7 | 3.5 | Sea transport distance (km) | 213 | 424 | 157 | — | 321 | Sea transport time (h) | 6.3 | 11.5 | 9.6 | — | 8.5 | Airway distance (km) | — | 317 | 254 | 387 | 154 | Airway time (h) | — | 1.3 | 1.1 | 1.9 | 0.8 |
|
|