Research Article

Path Design and Planning and Investment and Construction Mode of Multimodal Transport Network Based on Big Data Analysis

Table 4

Transport paths and time at node J.

Transit nodeFGJJJ
JJHDK

Railway distance (km)322225
Railway time (h)4.72.8
Highway distance (km)415321357226268
Highway time (h)5.34.54.62.73.5
Sea transport distance (km)213424157321
Sea transport time (h)6.311.59.68.5
Airway distance (km)317254387154
Airway time (h)1.31.11.90.8