Research Article

Path Design and Planning and Investment and Construction Mode of Multimodal Transport Network Based on Big Data Analysis

Table 5

Optimal path decisions under different freight transport modes.

Transport modeHighwayRailwayAirwayHighway-railwayHighway-airway

PathA-B-H-J-K-OA-B-E-H-F-K-OA-G-L-OA-E-G-J-L-M-T-OA-G-D-F-K-O
Combination11111333333222113333121111
Total cost (yuan)14519.6551852.8571561.5634035.4538013.42
Total time (h)38.2523.3612.5827.3426.52
Waiting time (h)16.733.682.491.75
Time satisfaction00.085100