Research Article
Path Design and Planning and Investment and Construction Mode of Multimodal Transport Network Based on Big Data Analysis
Table 5
Optimal path decisions under different freight transport modes.
| Transport mode | Highway | Railway | Airway | Highway-railway | Highway-airway |
| Path | A-B-H-J-K-O | A-B-E-H-F-K-O | A-G-L-O | A-E-G-J-L-M-T-O | A-G-D-F-K-O | Combination | 11111 | 333333 | 222 | 1133331 | 21111 | Total cost (yuan) | 14519.65 | 51852.85 | 71561.56 | 34035.45 | 38013.42 | Total time (h) | 38.25 | 23.36 | 12.58 | 27.34 | 26.52 | Waiting time (h) | 1 | 6.73 | 3.68 | 2.49 | 1.75 | Time satisfaction | 0 | 0.085 | 1 | 0 | 0 |
|
|