Research Article
Research on a Model for an Empirical Analysis of Inherent Defect Insurance Based on Ruin Theory
Table 1
Claim settlement details of each engineering division and subdivision in Shanghai in 2021.
| Scope of claim settlement | Claim settlement number | Proportion (%) | Claim settlement amount (yuan) | Proportion (%) | Average claim settlement amount (yuan) |
| 10-year term foundation and main structure | 10 | 0.80 | 134444.00 | 1.25 | 13444.40 | 5-year term waterproofing and insulation | 817 | 65.73 | 7219099.04 | 67.30 | 8836.11 | 5-year term window and door | 1 | 0.08 | 6150.00 | 0.06 | 6150.00 | 5-year term wall and ceiling plastering layer | 2 | 0.16 | 8366.00 | 0.08 | 4183.00 | 2-year term electrical, water supply, and drainage | 145 | 11.67 | 1842486.87 | 17.18 | 12706.81 | 2-year term window and door | 83 | 6.68 | 241773.00 | 2.25 | 2912.93 | 2-year term wall and ceiling plastering layer | 44 | 3.54 | 282834.99 | 2.64 | 6428.07 | 2-year term renovation | 141 | 11.34 | 990910.30 | 9.24 | 7027.73 | Total | 1243 | 100.00 | 10726064.20 | 100.00 | 8629.17 |
|
|