Ground Settlement of High-Permeability Sand Layer Induced by Shield Tunneling: A Case Study under the Guidance of DBN

Table 3

Engineering control standards.

Monitoring projectControl value (mm)Cumulative warning value
YellowOrangeRed

Ground settlement-30 mm-21 mm-25.5 mm-30 mm
(Bulge)+10 mm+7 mm+8.5 mm+10 mm
Segment uplifting+20 mm+10 mm+15 mm+20 mm