Summary of influencing factors and corresponding settlement values.

Influence factorsLevel of each factor ()
1234

Soil pressurePressure (bar)1.52.02.53.0
Settlement (mm)2.151.751.381.22
Jack thrustThrust (kN)
Settlement (mm)7.8111.5413.0114.12
Cutter head torqueTorque (kN·m)
Settlement (mm)-1.51-3.68-5.95-6.47
Tunneling speedSpeed (mm/min)25303545
Settlement (mm)-1.80-3.01-3.93-4.65
Grouting volumeVolume (m3)3456
Settlement (mm)-5.34-5.11-4.35-2.57
Grouting pressurePressure (bar)2.02.53.03.5
Settlement (mm)-2.18-2.07-1.95-1.79
Permeability coefficientCoefficient (cm/s)1e-41e-30.010.1
Settlement (mm)3.686.2311.2416.37
Slurry densityDensity (g/cm3)1.21.41.61.8
Settlement (mm)13.6511.649.636.23