Summary of construction parameters.

Influence factorsSection/rings
0~5050~150

Soil pressure (bar)1~1.31.3
Jack thrust (kN)12000~1800016000~24000
Cutter head torque (kN·m)5000~60007500~8500
Tunneling speed (mm/min)20~3025~35
Grouting volume (m3)4.5~6.04.5~6.0
Grouting pressure (bar)2~33~4
Permeability coefficient (cm·s)
Slurry density (g/cm3)1.321.32