Summary of construction parameters.
| Influence factors | Section/rings | 0~50 | 50~150 |
| Soil pressure (bar) | 1~1.3 | 1.3 | Jack thrust (kN) | 12000~18000 | 16000~24000 | Cutter head torque (kN·m) | 5000~6000 | 7500~8500 | Tunneling speed (mm/min) | 20~30 | 25~35 | Grouting volume (m3) | 4.5~6.0 | 4.5~6.0 | Grouting pressure (bar) | 2~3 | 3~4 | Permeability coefficient (cm·s) | | | Slurry density (g/cm3) | 1.32 | 1.32 |
|
|