Stability Monitoring and Analysis of High and Steep Slope of a Hydropower Station

Table 1

Multipoint displacement meter cumulative deformation monitoring results.

Monitoring sectionNumberElevation (m)Monitoring start time (yy/mm/dd)Cumulative deformation by August 10, 2017 (mm)Remarks
40 m30 m20 m10 m0

1-1M01925.513/10/2001.424.336.165.2415/3/27 damage
17/03/10 resume monitoring
M02895.513/09/2202.452.7/18.2615/3/27 damage
17/03/10 resume monitoring
M03865.514/01/03036.8327.1333.6938.8615/3/27 damage
17/03/10 resume monitoring

2-2M04925.513/05/05/01.021.612.2915/5/7 damage
17/04/5 resume monitoring
M05895.513/05/05/00.773.53.513/7/6 damage 17/04/5 resume
M06865.513/05/05/00.342.652.7814/3/7 damage, 17/04/5 resume

3-3M07925.513/05/05/00.711.213.2
M08895.513/05/05/01.82.434.5515/10/23Damage
17/04/4 resume
M0986513/05/05/01.392.073.3315/10/23Damage
17/04/4 resume

4-4M10925.513/08/310-0.282.336.0971.2215/3/27 damage 17/3/10 resume
M1l986.814/12/19087.185.1791.7792.1515/3/27 damage 17/3/29 resume
M12987.714/12/1904.71/23.8574.6915/3/27 damage 17/3/29 resume

5-5M13880.516/05/09/09.5914.8322.2615/7/1 damage, 16/12/30 resume
M14850.316/08/20/0-8.26/21.86
M15830.317/03/25/03.328.1714.51

6-6M16850.316/08/14/05.5311.2314.79
M17830.317/03/25/01.682.623.6617/03/25 start