Review Article
Stability Monitoring and Analysis of High and Steep Slope of a Hydropower Station
Table 1
Multipoint displacement meter cumulative deformation monitoring results.
| Monitoring section | Number | Elevation (m) | Monitoring start time (yy/mm/dd) | Cumulative deformation by August 10, 2017 (mm) | Remarks | 40 m | 30 m | 20 m | 10 m | 0 |
| 1-1 | M01 | 925.5 | 13/10/20 | 0 | 1.42 | 4.33 | 6.16 | 5.24 | 15/3/27 damage 17/03/10 resume monitoring | M02 | 895.5 | 13/09/22 | 0 | 2.45 | 2.7 | / | 18.26 | 15/3/27 damage 17/03/10 resume monitoring | M03 | 865.5 | 14/01/03 | 0 | 36.83 | 27.13 | 33.69 | 38.86 | 15/3/27 damage 17/03/10 resume monitoring |
| 2-2 | M04 | 925.5 | 13/05/05 | / | 0 | 1.02 | 1.61 | 2.29 | 15/5/7 damage 17/04/5 resume monitoring | M05 | 895.5 | 13/05/05 | / | 0 | 0.77 | 3.5 | 3.5 | 13/7/6 damage 17/04/5 resume | M06 | 865.5 | 13/05/05 | / | 0 | 0.34 | 2.65 | 2.78 | 14/3/7 damage, 17/04/5 resume |
| 3-3 | M07 | 925.5 | 13/05/05 | / | 0 | 0.71 | 1.21 | 3.2 | | M08 | 895.5 | 13/05/05 | / | 0 | 1.8 | 2.43 | 4.55 | 15/10/23Damage 17/04/4 resume | M09 | 865 | 13/05/05 | / | 0 | 1.39 | 2.07 | 3.33 | 15/10/23Damage 17/04/4 resume |
| 4-4 | M10 | 925.5 | 13/08/31 | 0 | -0.28 | 2.3 | 36.09 | 71.22 | 15/3/27 damage 17/3/10 resume | M1l | 986.8 | 14/12/19 | 0 | 87.1 | 85.17 | 91.77 | 92.15 | 15/3/27 damage 17/3/29 resume | M12 | 987.7 | 14/12/19 | 0 | 4.71 | / | 23.85 | 74.69 | 15/3/27 damage 17/3/29 resume |
| 5-5 | M13 | 880.5 | 16/05/09 | / | 0 | 9.59 | 14.83 | 22.26 | 15/7/1 damage, 16/12/30 resume | M14 | 850.3 | 16/08/20 | / | 0 | -8.26 | / | 21.86 | | M15 | 830.3 | 17/03/25 | / | 0 | 3.32 | 8.17 | 14.51 | |
| 6-6 | M16 | 850.3 | 16/08/14 | / | 0 | 5.53 | 11.23 | 14.79 | | M17 | 830.3 | 17/03/25 | / | 0 | 1.68 | 2.62 | 3.66 | 17/03/25 start |
|
|