A Dynamic Risk Assessment Method for Deep-Buried Tunnels Based on a Bayesian Network
| | Nodes | Node range |
| | A1 section size | Medium | | Large | | A2 construction method | Center diagram method (CD) | Bench cut method (BCM) | Ring cut method (RCM) | Full face excavation method (FFEM) | Center cross diagram method (CRD) | | A3 tunnel depth | <15 m | 15~25 m | >25 m | | A4 surrounding rock level | IV | V | VI | | A5 groundwater | No water | Water leaking | Water gushing | | A6 mud inrush | No mud | Mud leaking | Mud inrush | | A7 prereinforcement effects | Good | Medium | Poor | | A8 support timing | In time | | Late | | A9 construction quality | Good | Medium | Poor | | A10 construction experience | Well experienced | Medium | Inexperienced | | A11 construction management | Strict | Medium | Poor | | A12 support strength | High | Medium | Low | | A13 inner-tunnel observation | Normal | Slight cracks | Slip off | | A14 arch crown convergence | III | II | I | | A15 side wall displacement | III | II | I | | B1 objective factor rating | I | II | III | | B2 subjective factor rating | I | II | III | | B3 monitoring factor rating | I | II | III | | C1 dynamic risk rating | I | II | III |
|
|