Research Article
Study of Tunnel-Face to Borehole ERI (TBERI) Measurement Configurations and Its Optimization
Figure 2
Sketch of two types of configurations. (a) A-M configuration. Electrode A is placed on the tunnel face while electrode M is placed in the borehole. (b) AM configuration. Both electrodes A and M are placed in the borehole.
| (a) |
| (b) |