Research Article

Study of Tunnel-Face to Borehole ERI (TBERI) Measurement Configurations and Its Optimization

Figure 4

The three-dimensional schematic diagram of the TBERI model used in the optimization simulation. The cube marked with dotted line is the target zone, and the weighting factor inside is 1, while the factor of the other zone is 10-12.