The Relationship between Mining-Induced Stress and Coal Gas under an Optimized Support Scheme: A Case Study in the Guanyinshan Coal Mine, China
Table 3
Monitoring drilling borehole construction parameters.
| Construction site | Borehole number | Azimuth angle (°) | Drilling angle (°) | Hole depth (m) | Sealing depth (m) | Construction time |
| DE-14+60m | d1 | 1 | 44 | 30.66 | 30 | 2018.11.10 morning shift | W1 | 1 | 21 | 36.50 | 28 | 2018.11.10 middle shift | DE-15+7m | d2 | 1 | 24 | 36.50 | 31 | 2018.11.10 morning shift | W2 | 1 | 47 | 29.20 | 24 | 2018.11.10 morning shift | DE-15+36m | d3 | 1 | 39 | 27.74 | 26 | 2018.11.10 evening shift | W3 | 1 | 17 | 33.58 | 28 | 2018.11.10 evening shift | DE-16+3m | d4 | 1 | 15 | 36.50 | 34 | 2018.11.9 middle shift | W4 | 1 | 38 | 29.20 | 24 | 2018.11.9 middle shift | DE-16+33m | d5 | 1 | 38 | 27.74 | 25 | 2018.11.9 middle shift | W5 | 1 | 15 | 36.50 | 30 | 2018.11.9 middle shift |
|
|