Construction siteBorehole numberAzimuth angle (°)Drilling angle (°)Hole depth (m)Sealing depth (m)Construction time

DE-14+60md114430.66302018.11.10 morning shift
W112136.50282018.11.10 middle shift
DE-15+7md212436.50312018.11.10 morning shift
W214729.20242018.11.10 morning shift
DE-15+36md313927.74262018.11.10 evening shift
W311733.58282018.11.10 evening shift
DE-16+3md411536.50342018.11.9 middle shift
W413829.20242018.11.9 middle shift
DE-16+33md513827.74252018.11.9 middle shift
W511536.50302018.11.9 middle shift