Research Article
Research on the Reasonable Strengthening Time and Stability of Excavation Unloading Surrounding Rock of High-Stress Rock Mass
Figure 12
Diagram for the plastic zone of roadway excavation support.
| (a) 5 m in front of the tunneling face |
| (b) At the tunneling face |
| (c) 5 m behind the tunneling face |
| (d) Heading direction of tunneling |