Research Article

Research on the Reasonable Strengthening Time and Stability of Excavation Unloading Surrounding Rock of High-Stress Rock Mass

Figure 12

Diagram for the plastic zone of roadway excavation support.
(a) 5 m in front of the tunneling face
(b) At the tunneling face
(c) 5 m behind the tunneling face
(d) Heading direction of tunneling