Analysis of Shunted Screen Gravel Pack Process and Calculation of Friction in Deepwater Horizontal Wells
Table 2
Comparison of simulation results and operation results.
Parameter
Model calculation results
Construction results
Errors and remarks
α-Wave packing length (m)
343.4
343.4
No error, packing can be completed
β-Wave packing length (m)
343.4
343.4
No error, packing can be completed
Total packing time (min)
195.03
251
100% packing is considered in the simulation, while 138% packing is achieved in the actual operation, so the simulation time is less than the actual packing time